S. Pmi and . Committee, A Guide to the Project Management Body of Knowledge (PMBOK), 2008.

E. Maytorena, G. M. Winch, J. Freeman, T. Kiely, R. J. Riek-]-r et al., The influence of experience and information search styles on project risk identification performance From experience: Capturing hard-won NPD lessons in checklists The controlling influences on effective risk identification and assessment for construction design management Reliability problem prevention method for automotive components-development of GD'3' activity and DRBFM method for stimulating creativity and visualizing problems, IEEE Transactions on Engineering Management Journal of Product Innovation Management International Journal of Project Management, vol.546, issue.36 4, pp.315-326, 2001.

T. Raz and E. Michael, Use and benefits of tools for project risk management, International Journal of Project Management, vol.19, issue.1, pp.9-17, 2001.
DOI : 10.1016/S0263-7863(99)00036-8

T. Williams, C. Chapman, S. W. Ahmed, B. Kayis, and S. Amornsawadwatana, How to manage project opportunity and risk: why uncertainty management can be a much better approach than risk management What's wrong with risk matrices? A review of techniques for risk management in projects, European Journal of Operational Research Risk Analysis Benchmarking: An International Journal, vol.8511, issue.14 1, pp.18-38, 1995.

D. Baccarini, The concept of project complexity???a review, International Journal of Project Management, vol.14, issue.4, pp.201-204, 1996.
DOI : 10.1016/0263-7863(95)00093-3

]. D. Chu, R. Strand, R. Fjelland, and M. Keil, Theories of complexity ? Common denominators of complex systems Functionality risk in information systems development: an empirical investigation, Complexity IEEE Transactions on Engineering Management, vol.814, issue.53 3, pp.412-425, 2003.

J. R. Bradley and H. H. Guerrero, An Alternative FMEA Method for Simple and Accurate Ranking of Failure Modes, Decision Sciences, vol.57, issue.3, pp.743-771, 2011.
DOI : 10.1111/j.1540-5915.2011.00329.x

J. A. Geymayr and N. F. Ebecken, Fault-tree analysis: a knowledge-engineering approach, IEEE Transactions on Reliability, vol.44, issue.1, pp.37-45, 1995.
DOI : 10.1109/24.376519

R. Ferdous, F. Khan, R. Sadiq, P. Amyotte, and B. Veitch, Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations, Risk Analysis, vol.18, issue.1, pp.86-107, 2011.
DOI : 10.1111/j.1539-6924.2010.01475.x

E. Lee, Y. Park, and J. Shin, Large engineering project risk management using a Bayesian belief network, Expert Systems with Applications, vol.36, issue.3, pp.5880-5887, 2008.
DOI : 10.1016/j.eswa.2008.07.057

C. Fan and Y. Yu, BBN-based software project risk management, Journal of Systems and Software, vol.73, issue.2, pp.193-203, 2004.
DOI : 10.1016/j.jss.2003.12.032

J. M. Lyneis and D. N. Ford, System dynamics applied to project management: a survey, assessment, and directions for future research, System Dynamics Review, vol.50, issue.1, pp.157-189, 2007.
DOI : 10.1002/sdr.377

J. Xu, X. Li, D. D. Wu-ackermann, C. Eden, and S. Howick, Optimizing Circular Economy Planning and Risk Analysis Using System Dynamics, Managing Risks in Projects, pp.316-331, 1997.
DOI : 10.1016/j.mechrescom.2006.09.011

I. Dikmen, M. T. Birgonul, and S. Han, Using fuzzy risk assessment to rate cost overrun risk in international construction projects, International Journal of Project Management, vol.25, issue.5, pp.494-505, 2007.
DOI : 10.1016/j.ijproman.2006.12.002

C. Fang and F. Marle, A simulation-based risk network model for decision support in project risk management, Decision Support Systems, vol.52, issue.3, pp.635-644, 2012.
DOI : 10.1016/j.dss.2011.10.021

URL : https://hal.archives-ouvertes.fr/hal-01207061

R. L. Dillon, M. E. Pate-cornell, S. D. Guikema, R. L. Dillon, M. E. Pate-cornell et al., Programmatic risk analysis for critical engineering systems under tight resource constraints Optimal use of budget reserves to minimize technical and management failure risks during complex project development, Operations Research IEEE Transactions on Engineering Management, vol.52, issue.3, pp.354-370, 2003.

E. Borgonovo and C. Smith, A Study of Interactions in the Risk Assessment of Complex Engineering Systems: An Application to Space PSA, Operations Research, vol.59, issue.6, pp.1461-1476, 2011.
DOI : 10.1287/opre.1110.0973

J. H. Holland, Adaptation in natural and artificial systems: An introductory analysis with applications to biology, control, and artificial intelligence An introduction to genetic algorithms, 1975.

M. Marseguerra, E. Zio, S. Martorell, and D. W. Coit, Basics of genetic algorithms optimization for RAMS applications Fault-tolerant embedded system design and optimization considering reliability estimation uncertainty, Reliability Engineering & System Safety Reliability Engineering & System Safety, vol.9132, issue.92 4, pp.977-991, 2006.

F. Cadini, E. Zio, and C. Petrescu, Optimal expansion of an existing electrical power transmission network by multiobjective genetic algorithms, Reliability Engineering & System Safety, vol.9533, issue.3, pp.173-181, 2010.
URL : https://hal.archives-ouvertes.fr/hal-00610500

Z. Ye, Z. Li, and M. Xie, Some improvements on adaptive genetic algorithms for reliability-related applications Using genetic algorithm to support portfolio optimization for index fund management, Reliability Engineering & System Safety, pp.120-126, 2005.

M. Gilli and E. Schumann, Heuristic optimisation in financial modelling, Annals of Operations Research, vol.11, issue.5, pp.129-158, 2012.
DOI : 10.1007/s10479-011-0862-y

S. V. Hartmann37-]-v, M. Peteghem, and . Vanhoucke, A self-adapting genetic algorithm for project scheduling under resource constraints, Naval Research Logistics, vol.4, issue.5, pp.433-448, 2002.
DOI : 10.1002/nav.10029

W. Huang and L. Ding, Project-scheduling problem with random time-dependent activity duration times Generating artificial chromosomes with probability control in genetic algorithm for machine scheduling problems, IEEE Transactions on Engineering Management Annals of Operations Research, vol.18040, issue.99 1, pp.1-11, 2010.

E. Vallada and R. Ruiz, A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times, European Journal of Operational Research, vol.211, issue.3, pp.612-622, 1971.
DOI : 10.1016/j.ejor.2011.01.011

D. Steward, The Design Structure Matrix: a method for managing the design of complex systems, IEEE Transactions on Engineering Management, vol.28, issue.3, pp.71-74, 1981.

T. Browning, Applying the design structure matrix to system decomposition and integration problems: a review and new directions, IEEE Transactions on Engineering Management, vol.48, issue.3, pp.292-306, 2001.
DOI : 10.1109/17.946528

M. Danilovic, T. R. Browning, S. D. Browning, and . Eppinger, Managing complex product development projects with design structure matrices and domain mapping matrices Modeling impacts of process architecture on cost and schedule risk in product development, International Journal of Project Management IEEE Transactions on Engineering Management, vol.2546, issue.49 4, pp.300-314, 2002.

V. Lévárdy, T. R. Browning, S. Cho, S. Eppinger, Y. Qian et al., An adaptive process model to support product development project management A simulation-based process model for managing complex design projects A novel approach to DSM-based activity sequencing problem Identifying controlling features of engineering design iteration, 49] R. Smith, and S. Eppinger, pp.600-620, 1997.

]. U. Lindemann, M. Maurer, and T. Braun, Structural complexity management: an approach for the field of product design, 2008.
DOI : 10.1007/978-3-540-87889-6

S. D. Eppinger and T. R. Browning, Design structure matrix methods and applications, p.2012

M. Sosa, S. Eppinger, and C. Rowles, The Misalignment of Product Architecture and Organizational Structure in Complex Product Development, Management Science, vol.50, issue.12, pp.1674-1689, 2004.
DOI : 10.1287/mnsc.1040.0289

P. J. Clarkson and J. R. Hamilton, Risk Analysis: a Quantitative Guide Signposting " , a parameter-driven task-based model of the design process, Research in Engineering Design, vol.1256, issue.1, pp.18-38, 2000.

C. Fang, F. Marle, and L. A. Vidal, Modelling risk interactions to re-evaluate risks in project management, Proceedings of the 12th International DSM Conference ? Managing Complexity by Modelling Dependencies, pp.31-44, 2010.

O. Holtz, On convergence of infinite matrix products, Electronic Journal of Linear Algebra, vol.7, issue.1, pp.178-181, 2000.
DOI : 10.13001/1081-3810.1054

I. Daubechies and J. C. Lagarias, Sets of matrices all infinite products of which converge, Linear algebra and its applications, pp.227-263, 1992.
DOI : 10.1016/0024-3795(92)90012-Y

R. Bru, L. Elsner, M. L. Neumann60-]-a, W. L. Nsakanda, M. Price et al., Ensuring population diversity in genetic algorithms: A technical note with application to the cell formation problem An introduction to simulated evolutionary optimization An improved genetic algorithm for the flowshop scheduling problem Genetic algorithms for optimization Genetic algorithm-based multi-objective model for scheduling of linear construction projects, Advances in Engineering Software, pp.183-193, 1994.