Abstract : Hydro power valleys (HPV) are large scale interconnected systems. All plant operations have to comply with technical and environmental requirements concerning level, flow rate and power variations. A two-layer hierarchical MPC solution, designed to manage the large scale constrained and time delayed HPV, is tested on a simulation platform. The upper layer optimizes the power profiles on a one-day horizon with a coarse step size. The lower level refines the control for a shorter horizon and step size. Simulations show that the coordination is able to improve the maneuverability of the HPV.
https://hal-supelec.archives-ouvertes.fr/hal-01155051
Contributor : Pascale Lepeltier <>
Submitted on : Tuesday, May 26, 2015 - 9:23:14 AM Last modification on : Monday, December 14, 2020 - 12:38:07 PM